Industrial flooring in helicopter-troweled concrete
Floors built with modern technologies and autonomous teams, for logistics, retail, production and storage.
We coordinate the entire process, from design and structural calculation to final sizing, for precise execution tailored to the requirements of the project.
Execution technology
- Concrete reinforcement with welded steel mesh or with dispersed polypropylene or steel fibres
- Pouring and levelling with laser screeds: high flatness and high productivity
- Mechanical floating and power trowelling with high-capacity ride-on trowels ("helicopters")
- Dry-shake quartz topping (natural, synthetic or metallic) to reduce wear
- Treatments and finishes: curing compounds and anti-evaporation sealers, nanotechnology-based treatments, grinding and polishing, with options for cleaning, colouring and sealing
Exclusive licence for Romania
PrimX-PROFAL: floors without contraction joints
Profal holds the exclusive licence for Romania to use the PrimX-PROFAL floor solution, which removes contraction joints completely and makes high flatness achievable.
- Reduced shrinkage
- No saw-cut joints
- Minimal joint opening
- No curling
- Minimised cracking
- High ductility and punching resistance, through steel-fibre reinforcement
- Savings on materials and labour
- A durable slab in aggressive environments
Anti-slip and herringbone ramps
We build anti-slip concrete ramps for:
- access to car parks and garages
- sloping or high-traffic areas
- spaces where superior grip is required
How is a helicopter-troweled concrete floor reinforced?
With welded steel mesh or with dispersed polypropylene or steel fibres, chosen in the design stage according to the loads and the use of the floor.
Which equipment do you use to pour and level the concrete?
The concrete is poured and levelled with a laser screed, then floated and trowelled with high-capacity ride-on power trowels.
Do you also design the floor?
Yes. We handle the design, the structural calculation and the final sizing, so that the floor matches the traffic, strength and use requirements of the project.
Quality and safety
Current certifications
- ISO 9001:2015Quality management
- ISO 14001:2015Environmental management
- ISO 45001:2018Occupational health and safety
- ISO/IEC 27001:2022Information security
- EN ISO 3834-3Quality of fusion welding (standard requirements)
The URS certificates cover (translation): „Floor laying and wall cladding works, including interior platforms and access roads, production and installation of PVC joinery, construction of sewer networks and earthworks”.
EN ISO 3834-3 covers: Fabrication of welded metal structures and components (production: Calea Torontalului DN6 km 6, PITT platform, Timișoara). WPQR (qualified welding procedures) and welders certified to SR EN ISO 9606-1.
Copies of the certificates on request · Details in the capability sheet (in Romanian)